1, fast disassembly, easy to move except for the equipment such as screw conveyor, cement warehouse, mixing station all the wiring does not need to be removed, only 30 tons of crane cooperation, one day can be removed and shifted. When installing, if the ground is smooth and solid, no foundation is required, the production can be in place on the same day, which is very suitable for units with tight construction requirements. The station is equipped with tires and traction pins, allowing a maximum speed of 60 km/h when towed by a trailer. The total weight of all equipment in the mixing station is 23.5 tons, and all accessories are removed with the station at one time when the station is moved.
2, good mixing performance using the forced double horizontal shaft mixer, you can use the shortest mixing time to achieve uniform mixing. For dry hard, semi-dry hard, plastic and various proportions of concrete can complete good mixing.
3, the configuration of high-grade, high reliability, accurate measurement, easy to operate stirring host reducer, metering sensors, and the main electrical components of the control system are imported components, not only greatly reduce the failure rate of the equipment, but also improve the measurement accuracy of the equipment.