Only reasonable construction of concrete mixing station, in order to better ensure the progress of the project, in the establishment of concrete mixing station should pay attention to what matters?
1. The installation foundation of the equipment should be selected in an open place in order to shorten the loading cycle of the loader. At the same time, it can also ensure that the turning of the finished material transport vehicle is convenient, smooth and powerful without interference.
2. The site should be smooth and intact, and be compacted. At the same time, the supporting foundation of each component should be prepared in advance according to the position of the large sample (the large sample should be retained until the installation of the equipment is completed). The secondary grouting holes of the anchor bolts should be left for the concrete pier of the mixed material storage bin and the powder supply system.
3. When preforming the foundation, it is necessary to ensure its flatness and size requirements, so that the equipment is firmly installed and the lap is reasonable. Because the quality of the foundation will affect the normal work and use quality of the equipment.
4. According to the size of the site, the stacking of raw materials and the configuration of the loader, the loading side of the batching unit is determined.
5. In order to facilitate the loading of the loader, the loading slope pier should be set on the loading side of the batching unit, and a patrol channel with free access should be retained between the batching unit to facilitate the inspection, repair and maintenance of the equipment and operation. At the same time, a protective fence should be set up between the loading pier and the batching unit to avoid the accumulation of materials scattered by the loader during loading, which will adversely affect the normal operation of the aggregate belt conveyor in the concrete mixing station.