1. The HZS75 concrete mixing plant requires a small site, and can save up to one-half to two-thirds of the land occupation area compared with the usual inclined belt conveying mixing plant.
2. Optional fixed in steel beam or fixed, steel beam concrete mixing plant on the main mixing system from the transport vehicle to the installation of only a few hours, together with the control room, batching station and other supporting equipment installation, HZS75 concrete mixing plant as long as two to four days to complete the preparation before production.
3. The equipment platform, measuring platform and lifting system platform of cement mixing station fully ensure the needs of calibration, inspection and maintenance equipment. There is still enough space for daily work when a protective layer is required.
4.HZS75 concrete mixing plant adopts the method of lifting hopper to load, and the unique design of hopper and track can conveniently and efficiently hold and dump aggregates, and greatly reduce the site occupation area